Baku: The Shimal-2 combined-cycle power plant has generated 21.1 billion kWh of electricity since it was commissioned through September of this year, the Ministry of Energy said. The power plant, located in Baku, was commissioned seven years ago on September 5, 2019, and has an installed capacity of 400 MW.
According to Azeri-Press News Agency, the Shimal-2 Power Plant has played a significant role in contributing to the region’s energy supply. The plant’s output is a vital component of the national grid, ensuring a stable power supply for various sectors. The Ministry of Energy continues to monitor the plant’s performance to maintain efficiency and reliability in electricity generation.