Skip to Content

Friday, September 18th, 2020

A. Mamin: In 2016, work on road infrastructure modernization conducted

Closed
by November 4, 2016 General

In addition, the road Shymkent – Tashkent (100 km, 4 lanes), Almaty – Kapshagay (104 km, 6-lane traffic) and Kapshagay – Taldykorgan (141 km), Astana – Temirtau (171 km) Aktau – Beyneu (470 km, 4-lane traffic) will be opened.

The corridor Astana – Kokshetau – Petropavlovsk (489 km)

is fully open.

Recall, Deputy Prime Minister of Kazakhstan Askar Mamin chaired a conference on the development of a roads network of national and local significance, and roadside service.

Source: Kazakhtan 2050

Previous
Next